Count the entry and exit on both venues. A positive funding spread can still produce a negative total return.
A funding spread can look attractive while the trade itself loses money. The first estimate to calculate is the cost of opening and eventually closing the complete pair, followed by the holding time needed to recover that cost.
Count four executions
A two-venue long-short pair normally has four executions: open the long, open the short, close the long and close the short. Each execution has its own notional and fee schedule.
Total trading fees = sum of (execution notional × applicable fee rate)
Do not multiply a single opening fee by two and assume the trade is covered. Check whether your exit is likely to be a maker or taker order and whether its fee tier differs. A posted limit order is not necessarily a maker fill if it immediately crosses the book.
Estimate the full round trip
Consider a hypothetical pair with $10,000 notional on each leg and a 0.04% taker fee on every execution. Assume unchanged exit notional for simplicity.
| Cost | Illustrative amount |
|---|---|
| Four executions at $4 each | $16 |
| Combined spread and slippage allowance | $8 |
| Deposit, withdrawal or network costs | $2 |
| Estimated total | $26 |
The 0.04% fee is invented. Check your own tier and market. Hyperliquid's fee documentation illustrates why the maker/taker distinction and volume tiers matter; it is not a universal schedule for other venues.
Calculate a break-even horizon
Assume expected net funding is $5 per day after paying the long leg's funding but before the round-trip costs above:
Break-even days = $26 ÷ $5 = 5.2 days
That is a simplified constant-carry estimate. If net funding falls to $2 per day, the same cost needs 13 days. If carry becomes zero or negative, the original calculation no longer gives a meaningful recovery horizon.
Funding may be discrete rather than a smooth daily cash flow. Translate this estimate into the number and timing of actual eligible settlements. Add borrowing or recurring operational costs to daily expenses if they apply.
Avoid counting a cost twice
An execution shortfall measured from a common reference price can already include both crossing the spread and market impact. If you add a second full spread allowance to it, you may double-count costs.
Choose a consistent method: either model each execution relative to a reference price, or use separate estimates with a clear definition. Save actual fills so that you can compare the estimate with realized costs later.
Include adverse scenarios
Break-even funding is not break-even total P&L. A widening basis between the venues, a failed hedge fill or a forced liquidation can create a loss larger than the estimated carry.
Before opening, calculate three cases: the observed funding spread persists, the spread halves, and it reverses. Then estimate a less favorable exit quote for the intended size. If the trade only works with optimistic maker fills and unchanged funding, the margin for error is small.
Use PerpDEX rankings for an initial fee comparison, and verify the account-specific terms on each exchange. Read the complete arbitrage example to connect costs with basis and margin risk.
Sources and assumptions
Source checked on 29 October 2026. All numerical inputs are hypothetical. Rebates, taxes, collateral price changes and borrow costs are excluded from the worked example.
Check your own assumptions
Use the guide as a framework, then inspect the relevant markets and inputs on PerpsMania.
Compare PerpDEX feesEducational material, not personalized investment advice. Numerical examples are hypothetical unless explicitly identified as sourced market data. Perpetual trading can result in loss of all posted collateral. Some product pages contain referral links; PerpsMania may benefit when you use them.